Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
Document Type and Number:
WIPO Patent Application WO/2024/032815
Kind Code:
A1
Abstract:
The present application provides a construction method for a water body replacement type storage yard. The construction method comprises: the construction of a water-stopping cofferdam; enclosure drainage construction: after the water-stopping cofferdam is closed, draining water in the enclosed range of the water-stopping cofferdam to expose a pit body, so as to create dry construction conditions; the construction of a stacking yard: constructing the stacking yard on the pit body under the dry construction conditions, which comprises: constructing a lower low-level floor and a higher high-level floor, wherein the low-level floor is lower than an average water level on an outer side of the water-stopping cofferdam, and the high-level floor can be used for the traveling of a stacker-reclaimer apparatus, which can convey materials into or away from a warehouse body; and the construction of the warehouse body: constructing the warehouse body on the low-level floor.

Inventors:
PAN WEI (CN)
LI YIYONG (CN)
LI ZENGJUN (CN)
MENG FANLI (CN)
ZHANG NAISHOU (CN)
HOU JINFANG (CN)
DU CHUANG (CN)
Application Number:
PCT/CN2023/116436
Publication Date:
February 15, 2024
Filing Date:
September 01, 2023
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
CCCC FIRST HARBOR ENG CO LTD (CN)
International Classes:
E02D19/04; E02B3/18
Foreign References:
CN115573363A2023-01-06
CN115852902A2023-03-28
CN110921342A2020-03-27
CN110080169A2019-08-02
CN102345300A2012-02-08
US5082393A1992-01-21
AU1418997A1997-07-03
CN202211293054A2022-10-21
Attorney, Agent or Firm:
QINGDAO LAWSCI INTELLECTUAL PROPERTY CO., LTD. et al. (CN)
Download PDF: