Title:
METHOD FOR REDUCING CRACKS AT PIER-PILE CAP JUNCTION PORTION
Document Type and Number:
WIPO Patent Application WO/2024/092616
Kind Code:
A1
Abstract:
A method for reducing cracks at a pier-pile cap junction portion, comprising: step 1, pouring a first layer, the first layer being a first layer of a pile cap, having a height of 4 m and being made of C40 concrete; step 2, pouring a second layer, the second layer being a second layer of the pile cap, having a height of 2.7 m and made of C40 concrete; step 3, pouring a third layer and a fourth layer, the third layer and the fourth layer being a pier-pile cap junction portion and being both made of C50 concrete; and step 4, stepwise pouring a fifth layer, a sixth layer, …, a tenth layer until pouring of a pier is completed, the fifth layer being the bottom portion of the pier, having a height of 2.5 m and having variable cross sections, the sixth layer being a hollow thin-wall pier body, and the fifth layer and the sixth layer having the same sectional area and being both made of C50 concrete.

Inventors:
CUI CHENGNAN (CN)
DAI LING (CN)
DONG CHENYANG (CN)
XIANG HUI (CN)
ZHOU CHENGLONG (CN)
CAI HUA (CN)
ZHANG WENDONG (CN)
Application Number:
PCT/CN2022/129554
Publication Date:
May 10, 2024
Filing Date:
November 03, 2022
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
CHINA CONSTRUCTION RAILWAY INVEST & CONSTRUCTION GROUP CO LTD (CN)