Login| Sign Up| Help| Contact|

Patent Searching and Data


Matches 651 - 700 out of 3,555

Document Document Title
JP6809834B2
To provide a scaffold support member configured to easily form a scaffold even in a folded-plate roof including a seam fastening structure in a crest part, and a scaffold structure on the folded-plate roof.A scaffold support member 1 is ...  
JP2020200679A
To provide a fastening device capable of improving workability in assembly and disintegration of temporal scaffold.A fastening device 10 connecting a flange 16 of a column 12 and a connection member 14 is provided with a jaw metal fittin...  
JP2020200639A
To solve the problem that a conventional framework scaffold has a complicated structure so as to increase a height of each layer to larger than a standard product height of a building frame, and also has a structure made complicated for ...  
JP6796010B2
To hold a binder 20 that is wedge-fastened to a flange Y of a support column X in a posture that does not prevent attachment/detachment to/from the flange Y.A wedge tightening tool comprises at least: a main body member 10 having a notch...  
JP2020190171A
To provide a construction safety scaffold capable of enhancing bending strength while saving weight of a product.The present invention relates to a construction safety scaffold, and includes connecting a plurality of scaffold members (18...  
JP3229100U
To provide a bolt and nut for fastening which can be mainly used for a pipe clamp for temporary construction. A bolt 9 having a mounting portion 14 at one end of a screw shaft portion 15, a nut 12 screwed into the screw shaft portion 15,...  
JP6785576B2
To provide an assembling method of hanging foothold capable of improving the workability by reducing the work load imposed to works at site.The assembling method of a hanging foothold 1 is an assembling method in which a long columns 11 ...  
JP6782382B1
To provide a new temporary handrail capable of easily adjusting the position of a handrail bar according to a distance between a work scaffold and a building. A lock pin 40 at an end of each bracket 110, 110 is provided so as to be subst...  
JP6784712B2
To provide a support for temporary scaffold wherein four pocket metal fittings can be arranged at the same height.The present invention is provided with a support body 1 to which a binding position 11 is set and a pocket metal fitting 2 ...  
JP2020180467A
To provide a roof structure for framework scaffolding capable of being easily installed even if the pipe diameters are slightly different without the need for a dedicated joint member.A frame of a roof structure for framework scaffolding...  
JP2020180468A
To provide a roof structure for single-tube scaffolding capable of being easily installed on a single-tube scaffolding.A frame of a roof structure for single-tube scaffolding includes: a clamp unit 110 that holds and fixes the vertical s...  
JP2020180463A
To make a scaffold connection tool easily attached to a flange of a post and to prevent falling of a wedge member after attachment.A scaffold connection tool comprises: a box-shaped body portion 2; and a wedge member 3 stored in the body...  
JP3228703U
To perform an operation for unfastening a belt when disassembling a scaffold in a belt fastening unit incorporated in a scaffold plate fixing device used when assembling a temporary work scaffold under a bridge, using a rod-shaped tool s...  
JP6781454B2
To provide a scaffold board connector capable of easily connecting a scaffold board, and capable of removing only a partial scaffold board after connection.A constitution of a connector 1 comprises a connector body 10, at least a pair of...  
JP3228209U
To change the position of a connecting pipe or a connected pipe by connecting the connected pipe and the connecting pipe so as to be perpendicular to each other while maintaining a certain level of strength even if it is a simple operati...  
JP6768023B2
To provide a device for preventing assembly material from coming out in a wedge binding type scaffold that can be easily manufactured.The present invention is directed to a device for preventing assembly material from coming out in which...  
JP2020159134A
To provide a method of constructing a building that enables work on a stable scaffold.The method includes: a scaffold installation step of installing a scaffold 1 along an outer circumference of a construction range of a building 5 and p...  
JP6759391B2
To provide a temporary scaffold connection structure capable of fixing a connection pipe at uniform length by restricting poor appearance and strength degradation of a welding portion with the connection pipe.In the structure where a con...  
JP2020139301A
To provide a gable-side preceding balustrade capable of reducing the number of components and suppressing a unit cost and production cost.A gable-side preceding balustrade 10 of the present invention comprises: an upper balustrade 20; a ...  
JP6749618B2
To provide a member for a temporary scaffold capable of enhancing workability of assembly and removal, and simply manufacturable.A member 1 for a temporary scaffold comprises a pair of wedge cutouts 5 and 6 fixed by a wedge member 4 to a...  
JP6751172B2  
JP6749600B2
To provide a preceding handrail that facilitates fitting work especially to a connection receiving part at a high location on a support post.A preceding handrail 1 has a connection receiving part 83 provided at a prescribed interval in a...  
JP6746551B2
To provide a temporary scaffold capable of preventing, so to call, pull-out such that connected support members are pulled out due to an external force when support members are connected to each other in series in the vertical direction ...  
JP6741817B1
To provide a good workability when fixing a scaffold plate, and to enable an operator to work safely and with peace of mind on the scaffold. A fixture of an embodiment includes an upper metal fitting, a lower metal fitting, and a lock me...  
JP6738451B1
To complete the attachment work of all members from the lower side of a scaffold plate in a scaffold plate fixture. An upper member A, a lower member B, and a bolt C for fastening the scaffold plate X are formed, and a holding portion 10...  
JP6734828B2
To provide a support member for temporary scaffold capable of connecting a support member in a vertical direction in series without using relationship between tenon and tenon.A support member for rooting 1 comprises: a support body 2 hav...  
JP6729881B2
To provide a fastening device for fastening a column and a joint member to each other for a scaffold.In a fastening device pressed-abutting a tip fastening part of a joint fixture to a surface of a column by press-fitting a wedge piece b...  
JP6726975B2
To provide a baseboard device mounted along a side part in the girder direction of a scaffold board faced to an outside space from a work space of a scaffold construction body.A baseboard device is the baseboard device positioned in both...  
JP6723364B2
An apparatus for fixing a scaffold plank for a scaffold is disclosed. One embodiment of the disclosed apparatus for fixing a scaffold plank for a scaffold is an apparatus for fixing a scaffold plank for a steel pipe scaffold for a scaffo...  
JP6716508B2
To provide a novel structure capable of eliminating hammering work and eliminating the impact sound, and smoothly connecting an end of one cylindrical bar to the other columnar bar.A fixing metal fitting 10 is provided on a column 1, a r...  
JP6713599B1
To provide a morning glory device which can be installed adjacent to two anti-building side portions constituting a protruding corner of a wedge-tied scaffold without using a mounting bracket dedicated to the protruding corner. A morning...  
JP6709921B1
To reduce a gap between a scaffolding plate and an outer wall surface and a gap between adjacent scaffolding plates when scaffolding plates are provided so as to line up along a curved outer wall surface. A scaffolding plate 1 is adjuste...  
JP6703392B2
To provide a seismic control clamp capable of improving energy absorption performance, and a temporary structure.A seismic control clamp 10 having a seismic control function of absorbing seismic energy is configured by coupling two clamp...  
JP6695152B2
To provide an attachment metal part for a kick plate, where the kick plate is arranged along an edge near end part of a passage floorboard in a vertical posture, that is, a gap between the kick plate and the passage floorboard is reduced...  
JP6695545B1
To provide a binding device in a wedge binding type scaffold capable of smoothly performing binding and releasing work and binding work at the time of packing by holding an unlocked wedge at an appropriate position. , Provide an unlocked...  
JP6689073B2
To provide a scaffold board fixing device that enables firm anchoring force of a scaffold board and that facilitates attaching and removing work.A scaffold board fixing device that fixes ends of a plurality of scaffold boards 2 arranged ...  
JP6685630B1
To provide a scaffolding plate capable of preventing an object from falling when connecting to each other. The scaffolding board 1 is a rectangular scaffolding board main body 4 having a long side 2 and a short side 3, a first connecting...  
JP6683877B1
To propose a cloth frame with a floor which can eliminate a gap formed between a horizontal member and a beam and can suppress a fallen deformation of a gripping metal fitting without using an extra member. An upper flange, a lower flang...  
JP6676363B2
To avoid a connection member, for connecting a horizontal material to a post by using a wedge, from being loosened from the post in a case of pulling out of the wedge, at an intersection part with the horizontal material connecting the p...  
JP6671878B2
To provide a member for a temporary scaffold capable of enhancing workability of assembly and removal, and simply manufacturable.A member 1 for a temporary scaffold comprises a pair of wedge cutouts 5 and 6 fixed by a wedge member 4 to a...  
JP3225550U
To provide a single pipe connecting jig which is lightweight and robust and can efficiently perform a single pipe connecting work. A connecting jig has a cylindrical first member 10 having an inner diameter capable of inserting a single ...  
JP2020033725A
To provide a scaffold panel for a temporary scaffold and a stacking structure thereof that inhibit coupling tools of a plurality of scaffold panels from interfering with each other when the scaffold panels are vertically stacked even whe...  
JP2020033726A
To provide a scaffold panel connector that even when a horizontal member of a scaffold panel held by holding means is a circular cross section member, inhibits the holding means from rotating around the circular cross section member.A co...  
JP3225284U
To provide a pipe clamp used for assembling a temporary work scaffold at a construction site. In a pipe clamp composed of a receiving member 2, a holding member 4, and fastening bolts and nuts 6, 7, a bottom plate portion 9 in a wide reg...  
JP6648059B2
To provide a scaffold beam frame capable of exerting the function of a connecting pin as required without using the connecting pin as a separate member.A connecting pin 20 that can be exposed at the upper end side of a support 10 is stor...  
JP2020023804A
To provide a lock device for preventing the upward movement of a jaw fitting in a tightened state in a wedge binding device used for a scaffold or the like.In a wedge binding device, a jaw fitting (12) fixed to a connecting member is pla...  
JP2020023780A
To provide a packaging box capable of surely holding a flap in a state of folded outward a barrel part, and having a lock piece hardly hindering work.A connector 3 of a rectangular industrial sheet 2 covers scaffolding 1 of a constructio...  
JP2020023856A
To provide a scaffold assembly device which is easily used in a work of assembling a small-scale temporary scaffold and is more safe.A scaffold assembly device includes a fixed member 11 fixed to an erected installed pipe, a rotary membe...  
JP2020020126A
To provide a wedge binding device used in a scaffold such as a temporary scaffold.In a wedge binding device in a scaffold, a wedge member (17) is inserted from above to below and driven from a standby position (P1) to a binding position ...  
JP2020020170A
To provide a joint device allowing a column and a lateral stay to be easily assembled while strength of a scaffold structure is maintained.A joint device is provided to connect a column and a lateral stay. The column includes a column bo...  

Matches 651 - 700 out of 3,555