Document |
Document Title |
WO/2024/050618A1 |
A method and system for vertically positioning a brick in a refractory wall. A mechanical arm is operable to move the brick to a first position above a final position for the brick and land the brick onto a mortar layer over the final po...
|
WO/2024/050863A1 |
The present invention relates to the technical field of vibration rods. Disclosed is a vibration rod of a portable brushless electric motor, the vibration rod comprising a sleeve, wherein a vibration housing is detachably and fixedly mou...
|
WO/2024/050593A1 |
A specialised void mat is designed to effectively seal gaps around service penetrations within floors. The mat consists of two main components: a sleeve and a base that interfaces with the sleeve. The base is generally planar and feature...
|
WO/2024/047878A1 |
This anchor bolt setting jig (10) is for setting an anchor bolt in a foundation. The anchor bolt setting jig (10) comprises: a support tool (20) which supports the anchor bolt; and a positioning tool (30) which positions the support tool...
|
WO/2024/047686A1 |
The objective of this disclosure is to provide a technology which connects main reinforcement members to each other while avoiding collision therebetween and allows reuse of a connection relationship between the main reinforcement member...
|
WO/2024/047267A1 |
The present invention relates to a movable formwork system for cladding part of a tunnel. The system comprises: a guide rail, fastening means for fastening the guide rail to a surface of the tunnel to be clad, a formwork panel attached t...
|
WO/2024/045331A1 |
The present invention relates to a concrete structure 5D printing method and system. The method comprises the following steps: 1) acquiring spatial data and environmental data of a concrete structure to be printed; 2) performing analysis...
|
WO/2024/047967A1 |
The present invention provides a management support system that can reduce man-hours of a worker and can increase security of safety in construction work and civil engineering work. The system comprises: a database for storing attribute ...
|
WO/2024/045596A1 |
The present application relates to the technical field of building construction, and specifically discloses a dry assembly structure of a prefabricated shear wall. The dry assembly structure comprises a first shear wall and a second shea...
|
WO/2024/047613A1 |
Ways of marking an open construction hole (301) may include using a marker device (100) for marking an open construction hole (301). The marker device (100) may include a planar body (101) including a top side (102) and a bottom side (10...
|
WO/2024/040298A1 |
The invention relates to a multi-part anchor assembly for use by a person at elevation including, an anchor body with an attachment means to attach the multi-part anchor assembly anchor body to a structure and an attachment point, for re...
|
WO/2024/038217A1 |
The invention relates to a robot for tracing marking lines for construction, which moves by means of movement wheels (16) and swivel wheels (17) to follow the path of the marking lines to be marked, the robot comprising an ink-depositing...
|
WO/2024/038096A1 |
The invention relates to a truck-mounted concrete pump (10), having a chassis (12), having two front and two rear support outriggers (14, 15, 16, 17) which can be supported on an underlying surface via extendable support legs (18, 19, 20...
|
WO/2024/038275A1 |
An apparatus is disclosed for securing a tube of uniform cross section to a brickwork corner to serve as a profile. The apparatus comprises at least one collar for sliding onto the tube to define fixed reference surfaces to contact the t...
|
WO/2024/037403A1 |
The present application provides a permanent framework, a building structure, and a spatial entity setting-out construction method. The permanent framework comprises two first frameworks (1) that are oppositely arranged in parallel; each...
|
WO/2024/034599A1 |
Provided are a roof repair method and a roof protection method with which a defective part of a roof of a structure can easily be repaired, and the infiltration of water can be prevented adequately. This roof repair method is for attac...
|
WO/2024/033641A1 |
The present invention relates to a building system comprising a kit of parts and a method of building construction from a kit of parts. The invention provides a method of construction of a building using a kit of parts, the method compri...
|
WO/2024/028525A1 |
The present invention relates to an underwater structure for protecting submerged archaeological sites having the particular feature of comprising a plurality of anchoring supports resting on the sea floor, which are joined to each other...
|
WO/2024/027029A1 |
Disclosed in the present invention is a pouring device, comprising: a bottom plate, which is provided with a first through hole; a baffle plate, which is connected to the bottom plate in a sliding manner, wherein the baffle plate can sli...
|
WO/2024/027595A1 |
Provided is a coke oven body building system. The coke oven body building system comprises a vertical lifting platform (10), a ground rail I (20), a cross beam (30), a top rail (40), a ground rail II (50), an articulated robot (60), a bu...
|
WO/2024/030019A1 |
In a method for manufacturing a module for a building using 3D concrete printing, after installing a reinforcing wire basket 11 for a supporting beam 13 on a substrate, a supporting plate 21 is arranged next to the reinforcing wire baske...
|
WO/2024/022836A1 |
The invention relates to a mobile printing system (1) for forming a strand (ST) of construction material (BS) for 3D printing of a construction part (BWT), wherein the printing system (1) comprises: - a printing head (2), wherein the pri...
|
WO/2024/021351A1 |
Provided are an assembling device and a construction method, which relate to the technical field of building construction. The assembling device comprises a mounting platform, a supporting rod, a connecting assembly and an adjusting asse...
|
WO/2024/024790A1 |
A sheet 2 for a structure comprises a functional layer 4, an intermediate layer 6, a pressure-sensitive adhesive layer 8, and a reinforcement body 10. The front surface Sf of the sheet 2 is an exposed surface of the functional layer 4. T...
|
WO/2024/017707A1 |
The invention relates to a climbing shoe for a construction aid, to a pawl device, to a fastening part for a climbing shoe, and to a method for manufacturing at least a portion of a concrete component. A climbing shoe (10) for a construc...
|
WO/2024/016538A1 |
Disclosed in the present application are a concrete protection material, a preparation method therefor, and a construction method thereof. The concrete protection material consists of, by mass percentage, 50-90% of a component A and 10-5...
|
WO/2024/018325A1 |
A composite connector for use with a fall-protection apparatus, the composite connector including a frame and a shroud that is mounted on the frame. The shroud includes a deformable section that at least partially defines a connection ar...
|
WO/2024/017407A1 |
The present invention relates to the technical field of building engineering, and particularly to a prefabricated concrete connection structure and a construction method. The prefabricated concrete connection structure comprises a shear ...
|
WO/2023/141138A9 |
A construction anchoring system includes one or more anchor apparatuses which are mountable relative to a form used to create a concrete support structure. The concrete is deposited in the form and cures whereby the one or more anchor ap...
|
WO/2024/011494A1 |
A rotating pump pipe connecting device and a wet spraying machine provided with the rotating pump pipe connecting device. The rotating pump pipe connecting device comprises a first pipe body (1), a second pipe body (2), a bearing assembl...
|
WO/2024/011331A1 |
Embodiments herein generally relate to methods, systems and devices for automated assembly of building structures. In at least one embodiment, there is provided a method for automated assembly of building structures, the method comprises...
|
WO/2024/007866A1 |
The present invention relates to the technical field of steel structure mounting. Particularly disclosed are a tool suitable for positioning, mounting and unloading a large steel structure, and a construction method. The tool comprises: ...
|
WO/2024/010024A1 |
This measuring method, with which it is possible to reduce the time and effort involved in installing three-dimensional surveying equipment, includes (step S104 and step S106): using a sensor device and the three-dimensional surveying eq...
|
WO/2024/008150A1 |
A support leg telescopic apparatus, a work machine, and a use method. The apparatus comprises a base body (100), a first telescopic arm (110), a second telescopic arm (120), a first sensing element (130), and a second sensing element (14...
|
WO/2024/007452A1 |
Disclosed in the present invention are a fixing device, a fixing device mounting method, and a wall construction method. The fixing device of the present invention is configured to connect a pipe to a plate, and comprises first limiting ...
|
WO/2024/010515A1 |
The present disclosure relates to a wire tying machine (100) adapted to tie wire knots (153) that secure reinforcement bars (105, 106) together. The wire tying machine (100) comprises a lid (160, a main body part (102), a trigger (140) a...
|
WO/2024/008566A1 |
The invention relates to an electrical drive device (200), for electrically driving an auto concrete pump (100), wherein the auto concrete pump has a concrete pump system (110) for conveying concrete, wherein the concrete pump system (11...
|
WO/2024/000034A1 |
A robotic construction system for use in constructing a structure, the construction system including a base, a boom extending from the base, an articulated working head attached proximate an end of the boom, the working head including a ...
|
WO/2024/005171A1 |
This binding device comprises a body part and a running part that causes the body part to run. The body part comprises: a reinforcing bar binding machine that feeds two wires to wrap around reinforcing bars, and twists the fed two wires ...
|
WO/2024/003195A1 |
The invention relates to a weighted base (10) for a mobile stop device (1) for securing a person at risk of falling, having a main part (100) with a plurality of arms (110), which are arranged in an angular manner relative to one another...
|
WO/2024/004085A1 |
The purpose of the present disclosure is to connect main reinforcement members while avoiding collisions, and to satisfy constraints when readjusting the placement of reinforcing steel bar members. The structural member design method acc...
|
WO/2024/000833A1 |
Disclosed in the present utility model is a masonry mortar joint control apparatus, comprising two positioning supports provided on a masonry wall. A connecting guide rail is fixedly connected between the two positioning supports; a guid...
|
WO/2024/000033A1 |
A robotic construction system for use in constructing a structure, the construction system including a base, a boom extending from the base, an articulated delivery head attached proximate an end of the boom, the delivery head including ...
|
WO/2024/003342A1 |
The foldout pipeline assembly (10), in particular for the application of concrete during the construction of tunnels, comprises: a plurality of pipeline segments (18) connected by pipe swivel joints (12), the pipeline segments forming a ...
|
WO/2024/005170A1 |
In the present invention, a binding device comprises: a rebar binding machine that binds, with a wire, the sites where rebar elements installed in a lattice shape intersect; a binding machine moving part for moving the rebar binding mach...
|
WO/2024/003193A1 |
The invention relates to a weighted base (10) for a mobile stop device (1) for securing a person at risk of falling, having a main part (100) with a plurality of arms (110), which are arranged in an angular manner relative to one another...
|
WO/2023/250139A1 |
Embodiments of the present disclosure related compositions of pyrolysis char bricks and methods of making compositions of pyrolysis char bricks. The composition includes about 30% to about 80% PC, about 0% to about 30% sand, about 15% to...
|
WO/2023/247325A1 |
The invention relates to a device (3) for additively manufacturing a component (2), the device comprising a material output unit (4), for depositing a building material, and an actuator assembly (5), which is designed to move the materia...
|
WO/2023/242253A1 |
The invention relates to a connection device (100) for connecting a securing device (200), for example a net, onto a ceiling formwork system (300) in order to produce a ceiling or a ceiling section in concrete construction, having a one-...
|
WO/2023/240812A1 |
The present invention belongs to the technical field of building construction, and particularly relates to an overall construction platform structure and method for adding a core tube wall body in the air, which are used for solving the ...
|